Alibaba.com

Verified Supplier | Xinxiang Tongda Road...

Xinxiang Tongda Road New Technology Co., Ltd.

China (Mainland) | Manufacturer, Trading Company | Contact Details
Experience:
Established 2008
10 years OEM
Performance:
Response Rate
Company Feedback

Quick Details

  • Place of Origin: Henan, China (Mainland)
  • Classification: Hot Melt Adhesives
  • Main Raw Material: Asphalt
  • Usage: Construction
  • Brand Name: Tongda
  • Model Number: Ningway
  • Color: Black
  • Main Composition: Asphalt
  • Using Method: Hot Melt
  • Softening Point: 95℃
  • Flow Level: 1.7mm
  • Best Heating: 160~170℃
  • Asphalt Compatibility: Compatible
  • Package: Translucent Plastic Film and carton outside

Packaging & Delivery

Packaging Details: Plastic bag inside and Carton Outside
Delivery Detail: 7 working days after receive your payment

Specifications

1.excellent adhesion.
2.flexibility under low temperature.
3.stability under high temperature.

 

We all know that water is the most destructive element to our pavements. If it rained and snowed

everywhere but on our roads and bridges, 90 percent of highway and street work would be

eliminated. Since that is not likely to happen any time soon, we need to prevent water intrusion

into our pavements. Filling or sealing pavement cracks to prevent water from entering the base

and subbase will extend the pavement life by three to five years.

Our “Ning-way” brand road crack sealant is a kind of hot applied road sealing material. It is made

Of matrix asphalt, high polymer, stabilizer and other additive. It is used for sealing the cracks and

Pit slots of the asphalt concrete pavement.

How to applied our hot applied road crack sealant?

 1. Close the traffic:
Set construction signs according to technical specifications in accordance with
road maintenance.

 

 

2. Clean the crack: Clean the cracks by cutter and blower.

 

3.Heat the road crack sealant by crack filling machine:
Put the crack sealant into heat container and heat it to 120~150°C. . Keep mixing
and stirring while heating, and keep the temperature below 170°C.

 

4.Fill the cracks and seal the pothole.

 

5.Open the traffic: The crack sealant can be solidified in 1 hour, you can open
the traffic in 1 to 2hour after the construction.

Buyer Product Name Price Quantity Order Time(GMT+8)
Email to this supplier
Verified Supplier - Xinxiang Tongda Road New Technology Co., Ltd.
China (Mainland) | Manufacturer, Trading Company | Contact Details
Experience:
Established 2008
10 years OEM
Performance:
Response Rate
Company Feedback

Communicate with Supplier

Ms. Na na
What can I do for you?
Minisite Survey